Pafawag 4E/HCP 303E
Posted: 08 Mar 2020, 10:47
EU07 is the name for a Polish electric locomotive in service of the Polish railway operator PKP. This locomotive was designed as a mixed traffic locomotive, and as such is used both in freight and passenger traffic. Nicknamed "The Seven" and "The Englishman".
Build date 1965–1994
Total produced 483
Maximum speed 125 km/h (78 mph)
Power output 2,000 kW (2,680 hp)
Tractive effort 280 kN (62,950 lbf)
Build date 1965–1994
Total produced 483
Maximum speed 125 km/h (78 mph)
Power output 2,000 kW (2,680 hp)
Tractive effort 280 kN (62,950 lbf)